GMP Clinical Trial Facility

Vanton is equipped with all one needs to prepare clinical trial materials. It locates in its Arnold Industrial place facility in Concord, California. The facility is divided into three zones – 10,000 (material transfer), 1000 (tablet/capsule), and 100 (aseptic 8’ glovebox)

  • Tablets/Capsules
  • Transdermal patch
  • Cream and Gel
  • Aseptic vials

The Facility was approved by California HHS in 2011. Since then, tablets, capsule, transdermal patches, over-encapsulation for POC have been prepared in this facility for phase I and II in US and abroad.

Vanton Labs can help you move your product development forward.

Copyright © 2015, Vanton Research Laboratory, LLC. All rights reserved.